It’s time for another production at school and today I went to start working on some of the more tedious jobs for the production. We had people hanging blacks and others were attaching the walls to the set. It’s all coming together and the next big thing (as far as the set is concerned) is the painting.
We also started doing some lights. My minions started out by cleaning some 2Ks but then it moved to some dangerous stuff. We had to attach some 22/40’s to the side perches. As they are the most dangerous things to get access to we came up with a way of making the ladder taller. We set up the ladder on top of 2 blocks, however it wasn’t tall enough for Belly’s liking so we had to set up the safety harness. It was probably the first time that we had ever attached lights on the sides in a safe way. It actually made life allot easier because I didn’t have to hold on to everything with one hand, (even though i still did most of the time
) I’d like to thank James for the pic’s